A Stormwater Pollution Prevention Plan (SWPPP) identifies potential pollutant sources on a construction site and describes the Best Management Practices (BMPs) that will be used to prevent those pollutants from reaching stormwater. Any land disturbance of one acre or more requires one.
A SWPPP documents the project site, identifies areas of land disturbance, lists all potential pollutant sources (soil, concrete washout, fuel, paint), and specifies which BMPs will be installed and maintained to control those sources. It also identifies responsible parties and describes the inspection and maintenance schedule.
SWPPP inspections are required at least every seven calendar days and within 24 hours of any qualifying rain event (typically 0.25 inches or more). Inspection records must document the condition of all BMPs, any discharges observed, and any corrective actions taken.
BMP locations can be pinned to the project map so inspectors know exactly where each measure is installed. Inspection records, photos, and corrective action notes attach to the pin at that location — creating a geographic compliance record tied to the ground rather than a flat spreadsheet.