What you get
Map the opportunities you are pricing
Keep prospective job locations, contact notes, deal values, and current stages visible together. See which opportunities need a site visit or another conversation.
Keep the estimate visit with the site
Record access conditions, observed scope, and questions while you are there. Add photos and supporting documents within your plan allowance so the office has the location context.
Track proposals and the next follow-up
Update each opportunity's status and follow-up date as the bid progresses. HCH organizes the opportunity; your estimating tools still prepare the numbers and proposal.
Field measurements logged by station
Installed quantities recorded at the station where the work was performed — not entered into a spreadsheet from memory at the end of the week. The measurement is tied to the location, with a date and optional photo.
T&M documentation at the location of the extra work
Keep location-linked notes and permitted attachments alongside your T&M tickets. Enter supporting details manually and use your established billing process for labor, equipment, materials and approval.
Change order documentation from the field forward
Field conditions that generate change orders are logged at the pin — the directive, the changed condition, the photo. The estimator preparing the change order has a documented basis from the field record, not a reconstruction.
Field notes for manual quantity review
Record installed measurements and changed conditions at their locations, then compare them manually with the bid or quantity spreadsheet. HCH keeps the supporting context together; it does not calculate automatic quantity variances.
Pay application support documentation
Field measurements organized by location and date support progress billing. The project record shows what was installed, where, and when — the documentation the owner needs to verify the pay application.
Why not spreadsheets, sticky notes, or memory?
- A bid list shows the opportunity name, but not how its site relates to tomorrow's visits.
- Site photos, contact notes, and proposal follow-ups spread across separate tools are harder to review together.
- Field measurements entered into a spreadsheet at the end of the week lose the location, the conditions at the time of measurement, and the photo that would support a disputed quantity.
- T&M documentation assembled from text messages and verbal accounts produces a billing record the owner can reasonably dispute.
- Change order support packages assembled from emails and memory lack the field record basis that makes them defensible.
- Spreadsheet quantity tracking requires a separate map to understand where each measurement applies — two documents that are rarely in sync.
What Comes in HeavyCivilHelper?
Not a rigid system. A toolkit you configure.
Put the location, field photos, records, plans, and work areas on one map your team can use.

Set Custom Pins

Draw Lines & Routes

Group Work Zones and Phases

Timestamp Camera

Track Multiple Records Pins

Overlay Plan Sheets
Create an account, choose Free, then add your first project.
One Source of Truth
Aligned in Plan and Field Views
RFIs, directives, and field issues stay anchored to their real-world location as teams switch between the plan and live site.


Field measurements tied to the station, not estimated from plans
A bid quantity comes from the drawings. An installed quantity comes from the field. On a heavy civil project, those two numbers are rarely the same — and the difference is where the contractor gets paid or loses money. Field measurements logged at the station where the work was installed, with a date and a photo, create a defensible record of what was actually built. An estimator working from field records has a stronger position in the pay application and change order conversation than one working from plan quantities and memory.
Field crews and PEs can enter measurements and notes at a map location. Estimators can review that context alongside the bid in their existing quantity tools. The comparison is manual, and field notes do not replace an as-built survey or approved quantity determination.
T&M documentation before the extra work is forgotten
T&M work is the hardest to bill and the easiest to dispute. The directed work happens in the field. The billing happens in the office. Between those two events, the labor hours, equipment used, and materials installed are typically reconstructed from verbal accounts, texts, and field notes — a process that produces a billing record with gaps the owner will find and challenge.
T&M logged at the location of the directed work
The T&M record is at the pin where the work was performed — not in a spreadsheet row with a station number the owner can question. The directive that originated the T&M work is at the same location.
Supporting notes and attachments
Enter labor, equipment and material details in your notes and attach supporting tickets. HCH does not provide a structured T&M billing entry or determine pay-application completeness.
Context for the billing-period review
Review your dated field notes and attachments alongside the approved tickets in your billing system. HCH does not generate a complete monthly T&M log or calculate payment.
Common questions from estimators
- How does HeavyCivilHelper help before a bid is awarded?
- Use Bids & Estimates to map opportunities, record site-visit notes, track proposal status and follow-up dates, and keep permitted photos or documents with the location. Prepare the actual estimate in your existing estimating tools.
- Does HeavyCivilHelper calculate estimates or perform automatic takeoff?
- No. HCH organizes opportunities and supporting site information. It does not calculate material prices, labor costs, automatic takeoff, or bid totals. Keep those calculations and proposal preparation in your estimating system.
- How does HeavyCivilHelper help estimators document field measurements?
- Field measurements are logged as records tied to the station or location where the quantity was measured. Each entry includes the measurement type, unit, quantity, date, and optional notes or photos. When quantities are disputed during the pay application or at project close-out, the field measurement record is already there with the date, the location, and the method — not reconstructed from memory or estimated from plan dimensions.
- Can estimators track time and materials work in HeavyCivilHelper?
- Use location-linked records, notes and attachments to support T&M review. Enter the work description and supporting details yourself, and attach the approved ticket where permitted by your plan. HCH organizes supporting evidence; it is not a structured labor, equipment or materials billing system, and does not guarantee approval.
- How do estimators use HeavyCivilHelper to support change order documentation?
- Change orders originate in the field — a directive to do extra work, a changed material condition, a scope addition. When the field condition is documented at the pin with photos at the time it occurred, and the directed work is logged as a T&M record at the same location, the change order package has a foundation. The estimator preparing the change order request has the field documentation already organized by location, rather than assembling it from emails, texts, and verbal accounts.
- Can bid quantities be compared to field-measured quantities in HeavyCivilHelper?
- You can record field measurements and their locations, then compare those notes manually with your bid or quantity spreadsheet. HCH does not automatically reconcile bid and installed quantities or calculate a quantity variance ledger. Supporting photos and notes help the estimator review a proposed adjustment; they do not replace an as-built survey.
See it on a real map
The interactive demo loads sample data so you can click through it in under a minute.
Related
Track Bids & Estimates on a Map
From a prospective job location to a site visit, proposal, and follow-up.
Contractor Opportunity & Job Tracking
Understand where HCH fits alongside your CRM, estimating, and accounting tools.
Try the Bids & Estimates Demo
Explore a sample opportunity pipeline without signing in.
What Are Field Measurements?
Measurement types, units, and how quantities tied to a location back up billing and change orders.
What Is T&M in Construction?
Time and materials billing, T&M tickets, and force account work on civil projects.
What Is a Schedule of Values?
The SOV structure that controls progress billing and how field quantities connect to it.
What Is a Pay Application?
Progress billing documentation, lien waivers, and how field records support the application.
What Is a Construction Change Order?
How change orders originate in the field and what documentation makes them defensible.